We close out Pack 8 of our Titanic build by adding Decking to our new Central Boat Deck platform and connecting the platforms (and our previous Superstructures) together with Issue 44!
Category Archives: BUILD
Issue 43
Some of the final bridge area Bulkheads are connected and we install the LED Strip for the forward Boat Deck in Issue 43!
Issue 42
We install the Forward Bulkhead of the Bridge as well as a bunch of the bridge details with Issue 42. This is a long one!
Issue 41
Our Forward Boat Deck and Bridge platform arrives and the side navigation lights are installed as we complete Issue 41!
Issue 40
The Propellers and their Shafts are installed during Issue 40!
Issue 39
In Issue 39, we finish off the last of the Engine details and install the Central Turbine/Condenser assembly. I even add some extra lighting to our engine room!
Issue 38
Get ready for some action as we mount the Gearbox and test our main Engines for the first time during Issue 38!
Issue 37
A small electric Motor is connected to the Gearbox as we complete Issue 37!
Issue 36
Not only do we construct the massive Condensers and central steam Turbine, we extend the Engine Room Deck, and then mount both main Engines and install both Propeller Shafts in this long Issue 36!
Issue 35
In Issue 35, the magnificent Gearbox is assembled – this will drive our Engines and propellers in the right directions!