We close out Pack 8 of our Titanic build by adding Decking to our new Central Boat Deck platform and connecting the platforms (and our previous Superstructures) together with Issue 44!
Monthly Archives: April 2023
Issue 43
Some of the final bridge area Bulkheads are connected and we install the LED Strip for the forward Boat Deck in Issue 43!
Issue 42
We install the Forward Bulkhead of the Bridge as well as a bunch of the bridge details with Issue 42. This is a long one!
Issue 41
Our Forward Boat Deck and Bridge platform arrives and the side navigation lights are installed as we complete Issue 41!
Issue 40
The Propellers and their Shafts are installed during Issue 40!
Issue 39
In Issue 39, we finish off the last of the Engine details and install the Central Turbine/Condenser assembly. I even add some extra lighting to our engine room!